ABS 19:Mt.Kilimanjaro-
7 Days climbing Marangu route
Day 1
Depart for Namanga border town, continue to Arusha for lunch after
immigration formalities. Afternoon at leisure in Arusha . Dinner
and overnight in a hotel.
Mt Kilimanjaro Day 2
Drive from Arusha to Marangu gate. The climb starts at Marangu
gate through the fascinating rain forest to Mandara hut at 2744m
(9000ft) Meals and overnight at the hut.
Day 3
After breakfast climb through Alpine Meadows the altitude starts
to be felt. Enjoying the Fora and view of Mamwenzi peak, Horombo
Hut is reached at 3167m covering 12km from Mandara. Meals and
covering overnight at Horombo Hut.
.Day 4
After breakfast resume the climb. The landscape becomes rugged
and rocky. Giant groundsel and Lobellas appears. Kibo hut is reached
at 4732m at the base of the peak itself
NOTE: No water or firewood is available
after this point.
Day 5
Hours of the morning at 2:00am. It takes about 5 hours to climb
the steepest and most difficult part of the route to Gilman's
point 5,681m (18640ft). From Gilman's takes 1.5 to 2hrs to Uhuru
Peak 5,896m (19340ft). Descend to Horombo for dinner and overnight.
Day 6
Descent is rapid. After breakfast, walk down the Marangu gate
for transfer to Arusha. Dinner and overnight in Arusha.
Day 7
Transfer back to Nairobi or proceed to the next destination.
MT.KILIMANJARO: Machame
Route
Day 1. Nairobi/Arusha/Moshi
Depart Nairobi by morning shuttle to Moshi arriving late afternoon.
Dinner and overnight.
Day 2. Machame Hut
Drive to Machame Village. The climb begins at the end of the tarmac
road, walking for about 6 hrs gradually ascending through the
forested hills onwards to Machame Hut (3000m). Dinner and overnight.
Day 3. Shira Hut
Early in the morning, you will cross a valley and stream before
ascending a steep ridge. The path then drops into a river gorge
before you climb more gently onto the moorland of the Shira plateau
- 3,800m. Total climbing time is about 6hrs. Dinner and overnight.
Day 4. Barranco Hut
The path continues directly up the ridge towards Kibo, then turns
right and descends into Barranco gorge. Climb to Barranco hut
at 3940m shortly after. Total climbing time is about 6 hrs. Dinner
and overnight.
Day 5. Barafu Hut
Crossing the Barranco Valley, climb the Barranco wall (not technical
climbing), then follow the Kibo South Circuit. You will then turn
left and climb up a ridge for about 2 hrs to Barafu hut at 4,600m
. Dinner and overnight.
Day 6. Mweka Hut
Very early start for the summit first to Stella Point and then
Uhuru Peak at 5895m. After sunrise, descend down to Mweka hut,
which takes about 6 hrs. Dinner and overnight.
Day 7. Mweka Gate
This is the last day of your climb. You will descend to Mweka
Gate where you will be met and transferred to your hotel for dinner
and overnight.
Day 8. Arusha/Nairobi
Depart Moshi by morning shuttle back to Nairobi arriving late
in the afternoon..
|